Bathroom Remodels
Before Pic - The client wanted to update the bathroom by changing the old plastic jacuzzi tub, vanity, lighting, flooring and shower.
After Pic - All new cabinetry, sink, lighting, flooring, shower, and tub.
After Pic - The new shower enclosure of all glass.
Before Pic - The shower had old yellow tiles.
Before Pic - The vanity and lighting were out of date.
After Pic - The new bathroom features an updated floating vanity, mirror and lighting.
After Pic - The old tiles were replaced with a modern white tile design, black tile flooring and glass shower doors in black.
After Pic - The fixtures were updated with modern black hardware.
Before Pic - The entire bathroom was gutted to replace water-damaged wood in walls and flooring.
After Pic - The old discolored tub was removed and replaced with a black shower base. The flooring is 12"x24" black tiles with a stone texture. The glass block window was replaced with a clear glass transom.
After Pic - A new black metal shower door system was installed. A new towel bar and accessories were installed to match the shower door and faucets
After Pic - A new glossy dark gray floating vanity was installed with two drawers for storage.
After Pic - The shower has a black stainless niche for holding shampoo, etc.
After Pic - The new shower has a black, over-sized rain shower head and wand.
Before Pic - The client wanted to upgrade the plastic tub and replace the flooring.
After Pic - The new tub, tile surround and tile flooring.
After Pic - The new tile surround features a wall niche and new black shower hardware.
Before Pic - A closet being converted into a half bath. The plumbing installed.
Before Pic - The new vanity, toilet, flooring and duct work installed.
After Pic - The finished half bath with a new door.
Before Pic - The shower was old and needed an update.
Before Pic - The floor tiles were damaged.
After Pic - The shower has all new tiles for a updated look. The floor tiles were replaced and a new bathroom door was added.

